Wastewater Treatment Plant Domžale - Kamnik
STRAND WASTE WATER TREATMENT PLANT Domžale - Kamnik includes the construction of a new aerobic biological rate to achieve tertiary treatment by SBR technology (sequential reactors) and the construction of the input object for the reception of large quantities of waste water and appropriate mechanical pre-treatment, which will increase operational safety. The capacity of the upgraded central wastewater treatment plant will be 149,000 PE (Population Equivalent), which means that it will accept the waste water of all residents in the reception area and other waste water. After upgrading the wastewater treatment plant's fourth largest system for wastewater treatment in Slovenia, and ensuring the quality parameters of treated water for discharge into the river Kamniška Bistrica. The quality of treated water after the upgrade will be below the legally required parameters, ie below 10 mg / l total nitrogen and less than 1 mg / l total phosphorus. The project will contribute significantly to improving the quality of the Kamniška Bistrica River and to regulate the issue of waste water treatment in the region for at least the following 30 years.